Model 2 of the hottest power supply contract

2022-10-02
  • Detail

Power supply and consumption contract (2) model text

Contract No.:

power supplier

unit name (seal)

unit address

power consumer

unit name (seal)

unit address

month, month, day

in order to ensure the smooth implementation of the national plan and clarify the mutual rights and obligations of both parties, according to the economic contract law of the people's Republic of China The national power supply and utilization rules and relevant regulations, as well as the national plan, have been negotiated by both parties, so that parents and children can exchange this contract with each other, abide by it jointly and perform it strictly

the first power supply provides three-phase AC 50 Hz power with the following rated voltage to the power consumer

serial number power receiving point address power receiving voltage value (V) 4. Sheet metal

1

#2 ____, ____;

#3 ____, ____;

Article 2 according to the national plan and the power supply capacity, the annual, monthly and daily power supply quantity is agreed. See Schedule 1

Article 3 the time for the power user to use electricity is:

peak time: summer, other seasons

trough time: summer, other seasons

power consumption time of special equipment: summer, other seasons

Article 4 quality of power supply

1 According to the operation mode of the power system and the position of the power receiving point of the power user in the system, the power receiving voltage of the power receiving point is agreed to be:

#1 power receiving point, power receiving voltage volts

#2 power receiving point, power receiving voltage volts

#3 power receiving point, power receiving voltage volts

if the power transformation and distribution equipment, system operation mode and power receiving position change, the power receiving voltage value should be revised accordingly

2. According to the monthly average rate factor of the power user, the allowable variation range of the power supply voltage at the power receiving point is:

the allowable variation range of the monthly average power factor power supply voltage of the power user is more than 0.9 ± 5%

0.86 ~ 0.9 ± 7%

0.81 ~ 0.85 ± 8%

less than 0.80 ± 10%

when the power equipment is overhauled or the system operates under abnormal conditions, The allowable variation range of the power supply voltage at the power receiving point of the power user shall be increased by 5% as listed above

3. The allowable variation range of the frequency of the three-phase AC power supply provided by the power supply to the power user is:

-------- ------------- ------------- ------------- -------------

power consumption time │ exceeding the contracted power consumption proportion │ allowable variation range (Hz)

--------- ⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶ-

At low ebb │ │ ± 0.2

--------------------------------------------------------------------------------------------the original standard GB 177 (85) requires the loading rate and error range to be (500 ± 50) k//s[about (5000 ± 500) n/s] ------------

in case of failure of the main power plant of the system, the allowable variation range of frequency is ± 1 Hz, but the failure duration shall not exceed one hour

4. The higher harmonic current value of the power supplier at the power receiving point of the power consumer and the higher harmonic current value of the power injected by the power consumer at the power receiving point shall be lower than the limit value and allowable value specified in the Interim Provisions on harmonic management of power system issued by the Ministry of water resources and electric power

for the power consumer with impact load, when the impact load has affected the voltage quality of other users, the power consumer shall take measures to eliminate it

Article 5 the power user shall pay the power charge of the power used to the power supplier every month. Relevant electricity metering, electricity price, electricity fee settlement and electricity fee payment methods shall be handled in accordance with relevant regulations or the power supply and consumption agreement signed by both parties

Article 6 the economy of the default of the power supplier

1 In case of one of the following circumstances, which makes the contract unable to be performed or cannot be fully performed, the power supplier will not be liable for breach of contract. (Note: disclaimer)

(1) natural disasters such as typhoon, storm, icing, flood, lightning, earthquake, etc. that exceed the design capacity. No liability for breach of contract

in case of pressure resistance (2) for legitimate reasons, and notify the power consumer of power rationing in advance. For example, power rationing due to eliminating dangerous situations, handling accidents, repairing equipment, etc; Power rationing that exceeds the planned power consumption; Plan the maintenance and notify the power consumer of power rationing seven days in advance; Power rationing for power users due to the implementation of national orders, etc. No liability for breach of contract

(3) after automatic reclosing, the reclosing is good, or for the power consumer with standby power supply, only one of the power supplies is stopped, and other power supplies can still meet the capacity of the standby power supply equipment of the power consumer. It is not a breach of contract and will not be borne

(4) non power supply party, such as user's fault, bird damage, man-made damage, etc. No

2. In case of one of the following circumstances, which makes the contract unable to be performed or cannot be fully performed, the power supplier shall be liable for breach of contract

(1) faults caused by lack of experience, negligence, violation of regulations, etc. in the process of operation, operation, maintenance, test, etc

(2) fault not caused by the power supplier, but caused by the improper handling of the power supplier

(3) faults caused by improper handling of command, dispatching and other aspects by superior authorities or competent business authorities

3. If the power consumer is rationed without justifiable reasons, it shall make up for the insufficient power supply afterwards and make compensation. The compensation shall be calculated according to the power and quantity of electricity supplied less. The compensation for less supply of one kilowatt of electricity shall be three times the electricity price per kilowatt of electricity, and the compensation for less supply of one kilowatt of electricity shall be 0.5 yuan

the less supplied electricity is calculated by multiplying the difference between the average electricity consumption per hour in the month of normal electricity consumption or a certain number of days of normal electricity consumption by the number of hours of electricity restriction

4. When the power supply party causes the power failure of the power user, the power supply party shall